Need a Institute/Coaching Class?
IT Courses / Govt Exam Preparation
Higher Studies / Studies Abroad
Employment Notification No. BMRCL/ 29/ADM/2012/O&M Rec, Dated :Â 28.12.2012
Bangalore Metro Rail Corporation Ltd., invites applications for the post of Section Engineer/ Junior Engineer www.freshersworld.com
Name of Post | Qualification | No. of Post | Pay Scale | Age |
Section Engineer (Signalling/ Telecommunication/ Automatic Fare Collection) | Four years Engineering Degree in Electrical Engineering or equivalent qualification. | 01 | Rs. 16000- 30770  | 50 yrs |
Section Engineer (Electric Traction / Electrical  Maintenance / Lift  & Escalator) | Four years Engineering Degree in Electrical Engineering or equivalent qualification. | 00 | Rs. 16000- 30770 | 50 yrs |
Section  Engineer (Rolling Stock Maintenance) | 01 | Rs. 16000- 30770 | 50 yrs | |
Junior Engineer (Signalling/ Telecommunica tion/Automatic Fare Collection) | Matriculation plus three years  Engineering Diploma in Electrical or equivalent qualification. | 01 | Rs. 14000- 26950  | 50 yrs |
Junior Engineer (Rolling Stock Maintenance) | Matriculation plus three years  Engineering | 03 | Rs. 14000- 26950 | 50 yrs |
Maintainers  (Signalling & Telecommunication/Automatic Fare Collection) | Matriculation  plus two years ITI in Electrician / Operator Radio/ Engine Artificer / Fitter or equivalent Class I trade issued by MEG and Centre or other Armed Forces Trg Centre  in any one of the following specific Engineering  Trade:             Electrician / Operator Radio/ Engine Artificer / Fitter | 04 | Rs. 10170 - 18500 | 50 yrs |
Maintainers  (Rolling Stock) | Matriculation  plus two years ITI in Electrician/ Machinist/ Engine Artificer or equivalent Class I trade issued by MEG and Centre or other Armed Forces Trg Centre in any one of the following specific Engineering  Trade: Electrician/Machinist/Engine Artificer | 04 | Rs. 10170- 18500 | 50 yrs |
Maintainers  (Civil Structure  Works) | Matriculation plus two years ITI in Artisan (construction),Artisan (Wood Work),Welder, Artisan (Metallurgy),Painter  & Decorator and  Fitter or equivalent Class I trade issued by MEG and Centre or other Armed Forces Trg Centre  in Artisan construction),Artisan (Wood Work),  Welder, Artisan (Metallurgy),Painter  & Decorator and  Fitter   | 01 | Rs. 10170 - 18500     | 50 yrs |
Track Maintainers (Permenant Way) | Matriculation plus  2 years ITI in Artisan (Metallurgy),Engine Artificer & Welder or equivalent Class I trade issued by MEG and Centre or other Armed Forces Trg Centre in  any one of the following specific Engineering  Trade: Artisan (Metallurgy),Engine Artificer & Welder | 01 | Rs. 10170- 18500  | 50 yrs |
Customer Relation Manager (Operations) | Matriculation, plus  2 and 3 years  Graduate Degree  in BA / B. Sc. / B.Com / BBM / BBA. Instructional ability in any Defence institute for minimum two yrs Is preferred | 01 | Rs. 14000- 26950 | 50 yrs |
Station Controller (Operations) | Matriculation plus three years Diploma  in Electrical  Engineering /Bachelor of Science with Physics, Chemistry & Mathematics / Equivalent Qualification in Class I trade issued by MEG & Centre or other Armed Forces Training Centre in any one  of the following trades :   (i) Machinist  (ii) Engine Artificer (iii) Driver Special Vehicle (iv) AFV Drivers (v) Electrical | 08 | Rs. 14000- 26950 | 50 yrs |
Train Operator (Operations) | 08 | Rs. 14000-Â 26950 | 50 yrs |
Recruitment Process :  The selection will be made strictly on merit, on the basis of written examination and Interview (85 % weightage for written test marks and 15 marks for Interview).  Interview entails Aptitude/Skill Test/Psychological test wherever necessary. Short listed candidates will be called for verification of the original documents.
Job Summary
Several MRTS proposals for Bangalore have been in the pipeline for nearly 24 years. In 1982, a study suggested that the MRTS should have a route length of 12.20 km. and pegged the cost at Rs. 239.15 crores. In 1983, the Metropolitan Transit Project, an organization of Indian Railways, prepared a feasibility report for provision of suburban rail services on existing lines, a circular railway of 57.9 km. metro system on two corridors, in Phase-I 12.9 km. from Rajajinagar to Jayanagar and in Phase - II 11.2 km. from Hudson Circle to Krishnarajapuram. In 1988, a World Bank aided study was carried out by RITES and the study recommended a Commuter Rail System along with improvement of road transport system.
Fully solved online mock placement papers with latest test pattern,count down timer,detail test analysis with answer and explanation is available at Power Placement Preparation:P3.
Start your preparation now with P3 and increase your success probabiltiy.