Need a Institute/Coaching Class?
IT Courses / Govt Exam Preparation
Higher Studies / Studies Abroad
Knowlwdge of Auto CAD.
Preparation of All MEP(Plumbin, Fire Fighting, Electrical, Cordination) Services Drawing .
Knowldge of MEP industry.
Commercial, Residential Buildings, warehouse, Pharma, High Rise Buildings etc
Co-ordination Project MEP Drawing .
Capable of internal water supply & drainage layout (Plan & Sections)
Capable of external water supply layout Municipal water line to UGT with water meter.
UGT to OHT water supply loop at terrace
Water supply Down take & SLD
Internal drainage Soil, Waste & Rainwater down takes.
External Sewer drain to STP /Septic Tank/Municipal drain. rainwater down take to RWH Tank Or SWD To Municipal SWD.
Fire fighting Sprinkler Layout .
Fire fighting SLD.
Hydrant & yard hydrant
Pump room Layout .
Booster pump layout
Job Summary
Fully solved online mock placement papers with latest test pattern,count down timer,detail test analysis with answer and explanation is available at Power Placement Preparation:P3.
Start your preparation now with P3 and increase your success probabiltiy.