BMRCL jobs for Surveyor in Bangalore. Last Date to apply: 20 May 2017
Surveyor
Job Description
Surveyor recruitment in Bangalore Metro Rail Corporation Limited on “contract basis” only.
No. of Post : 02
Qualification : PUC (10+2) in Science Stream with Mathematics OR SSLC with Diploma in Land and City Survey which is conducted by Vocational Education Department of Karnataka State OR SSLC with ITI Certificate in Survey trade passed from Department of Employment and Training, Karnataka
Experience : Should have minimum experience of 2 years in Land Survey work.
Pay : Rs. 22000/-
Age : 45 years.
Job Particulars
About Company
Several MRTS proposals for Bangalore have been in the pipeline for nearly 24 years. In 1982, a study suggested that the MRTS should have a route length of 12.20 km. and pegged the cost at Rs. 239.15 crores. In 1983, the Metropolitan Transit Project, an organization of Indian Railways, prepared a feasibility report for provision of suburban rail services on existing lines, a circular railway of 57.9 km. metro system on two corridors, in Phase-I 12.9 km. from Rajajinagar to Jayanagar and in Phase - II 11.2 km. from Hudson Circle to Krishnarajapuram. In 1988, a World Bank aided study was carried out by RITES and the study recommended a Commuter Rail System along with improvement of road transport system.