Freshersworld does not charge any amount for job placement. Beware of fraudsters who ask you to pay on the pretext of giving a job. Know More

Post A Job

Power Grid Corporation of India Ltd jobs for Diploma Trainee Electrical in . Last Date to apply: 29 Jun 2021

Diploma Trainee Electrical

Power Grid Corporation of India Ltd
salary-icon Not disclosed
Expired

Posted: 21 Jun 21

Job Description

Advt.No.SR-II/2021/01

Recruitment for the post of Diploma Trainee (Electrical) for Southern Region Transmission System-II and Raigarh-Pugalur HVDC Project

i. POWERGRID requires bright, committed and energetic professionals to be inducted in the posts as detailed below for Southern Region Transmission System-II, having transmission network in the states of Karnataka, Kerala, Tamil Nadu & UT of Puducherry and Raigarh-Pugalur HVDC Project

1. Post Name: Diploma Trainee (Electrical)

2. No of Post: 35

3. Qualification: Full Time Regular 3 Years Diploma from recognized Technical Board/ Institute with minimum 70% marks for General / OBC(NCL) / EWS candidates and pass marks for SC/ST/PWD/Ex-SM. Higher technical qualification like B.Tech/B.E/ M.Tech/M.E etc with or without Diploma is not allowed.

4. Discipline: Electrical/ Electrical (Power)/ Electrical and Electronics/ Power Systems Engineering/ Power Engineering (Electrical)

5. Stipend during training period of One year: 27500/- p.m

6. Basic Pay on regularization: 25000/- in the pay scale of 25000-3%-117500/-

Age Limit:
Maximum Age (As on 29.06.2021) with relevant relaxation: 27 years for UR/EWS 30 years for OBC(NCL) 32 years for SC/ST

Application Fees:
Candidates belonging other than SC/ST/PwD/Ex-SM categories are required to pay a non-refundable Registration fee of 300/- + Transaction Charges.

Job Particulars

Education Diploma
Who can apply Freshers
Hiring Process Face to Face Interview
Employment TypeFull Time
Job Id1232112
Locality Address
Country India

About Company

Power Grid, the Central Transmission Utility (CTU) of the country, is engaged in power transmission business with the mandate for planning, co-ordination, supervision and control over complete inter-State transmission system. POWERGRID, as on July 2009, owns and operates about 71,600 ckt kms of transmission lines at 800/765 kV, 400 kV, 220 kV & 132 kV EHVAC & +500 kV HVDC levels and 122 sub-stations with transformation capacity of about 81,200 MVA.
Jobs By Location
Job & career videos
scroll-icon scroll-icon
scroll-icon youtube-img
scroll-icon youtube-img
scroll-icon youtube-img
scroll-icon youtube-img
scroll-icon youtube-img
scroll-icon youtube-img
scroll-icon youtube-img
scroll-icon youtube-img
scroll-icon youtube-img
ARE YOU A FRESHER? REGISTER NOW
Looking for your first Dream Job?
Update Resume
Upload Resume