Need a Institute/Coaching Class?
IT Courses / Govt Exam Preparation
Higher Studies / Studies Abroad
1. PREPARE AND PUT FORWARD FOR APPROVAL, DRAWINGS OF COMPONENTS UNDER DEVELOPMENT (SOLIDWORKS 2020).
2. QUALITY CHECK ALL COMPONENTS BEING MANUFACTURED AT VENDORS FOR DIMENSIONAL ACCURACY AND MATERIAL OF CONSTRUCTION.
3. MAINTAIN REGULAR INVENTORY OF DREDGER SPARES AND OTHER COMPONENTS.
4. FOLLOW UP WITH VENDORS ON OUTSOURCED JOBS AND PROVIDE FEEDBACK TO MANAGEMENT.
5. MAINTAIN ALL DOCUMENTATION RELATED TO OUTSOURCED PROJECTS.
6. MAINTAIN A COMPREHENSIVE DATABASE OF TECHNICAL LITERATURE REGARDING ALL COMPONENTS IN USE. I.E. DRAWINGS, DESCRIPTIONS, MATERIAL SPECIFICATIONS, QA/QC PLANS, ETC.
7. FOLLOW UP ON ITEMS IN TRANSIT.
8. ARRANGE CRANES / MATERIAL HANDLING FOR LOADING AND UNLOADING OF EQUIPMENT.
9. PREPARATION OF DISPATCH DOCUMENTS AS AND WHEN REQUIRED.
10. CO-ORDINATE MANUFACTURING ACTIVITIES BETWEEN WORKSHOP STAFF AND VENDORS. I.E. ENSURE AVAILABILITY OF MATERIAL, TOOLS, CONSUMABLES, ETC.
11. PREPARE PURCHASE AND SERVICE REQUISITIONS FOR PROJECTS, MATERIAL, CONSUMABLES AND TOOLS.
12. APPROACH VENDORS FOR QUOTATIONS AS AND WHEN REQUIRED.
Job Summary
Fully solved online mock placement papers with latest test pattern,count down timer,detail test analysis with answer and explanation is available at Power Placement Preparation:P3.
Start your preparation now with P3 and increase your success probabiltiy.