Freshersworld does not charge any amount for job placement. Beware of fraudsters who ask you to pay on the pretext of giving a job. Know More

Post A Job

BMRCL jobs for Director in Bangalore. Last Date to apply: 22 Dec 2018

Director

BMRCL
salary-icon Not disclosed
Expired

Posted: 07 Nov 18

Job Description

No.BMRCL/81/ADM/PRJ/2018.

Director Job Opportunity In Bangalore Metro Rail Corporation Limited

Director (Project & Planning)/01 Post

Qualification: Bachelor’s Degree in Civil Engineering.

Desirable Qualification: MBA or Master’s Degree in relevant field.

Experience: Essential Experience (Govt/Non-Govt): Experience in railway/metro construction or construction in large infrastructure projects of the Government or PSEs.

Desirable Experience: 25 years in Group ‘A’ Service in Central Government / Central PSEs /Metro Rail Corporations, out of which 5 years in SAG or equivalent grade

Minimum and Maximum Age at the time of appointment: 45 years minimum and 57 years maximum.

Retirement Age: 60 years; extendable by maximum 2 years at discretion of the Board. 

Remuneration: Rs.3.00 lakhs (Three lakhs) per month (i.e.Rs.2.75 lakhs pay and Rs.25,000 HRA) + other allowances.


Director (Rolling Stock, S & T, Electrical)/01 Post

Qualification: Bachelor’s Degree in Electrical or Mechanical or Electronics & Communication Engineering.

Desirable Qualification: MBA or Master’s Degree in relevant field.

Experience Essential Experience (Govt. / Non-Govt.): Experience in rolling stock or railway/metro electrification or signaling and telecommunication of railway/metro projects.

Desirable Experience: 25 years in Group ‘A’ Service in Central Government / Central PSEs /Metro Rail Corporations, out of which 5 years in SAG or equivalent grade.

Minimum and Maximum Age at the time of appointment: 45 years minimum and 57 years maximum

Retirement Age: 60 years; extendable by maximum 2 years at discretion of the Board.

Remuneration: Rs.3.00 lakhs (Three lakhs) per month (i.e.Rs.2.75 lakhs pay and Rs.25,000 HRA) + other allowances.

Job Particulars

Role hr admin
Education BE/B.Tech, MBA/PGDM
Who can apply Freshers
Hiring Process Face to Face Interview
Employment TypeFull Time
Job Id506333
Locality Address
Country India

About Company

Several MRTS proposals for Bangalore have been in the pipeline for nearly 24 years. In 1982, a study suggested that the MRTS should have a route length of 12.20 km. and pegged the cost at Rs. 239.15 crores. In 1983, the Metropolitan Transit Project, an organization of Indian Railways, prepared a feasibility report for provision of suburban rail services on existing lines, a circular railway of 57.9 km. metro system on two corridors, in Phase-I 12.9 km. from Rajajinagar to Jayanagar and in Phase - II 11.2 km. from Hudson Circle to Krishnarajapuram. In 1988, a World Bank aided study was carried out by RITES and the study recommended a Commuter Rail System along with improvement of road transport system.

Jobs By Location
Job & career videos
scroll-icon scroll-icon
scroll-icon youtube-img
scroll-icon youtube-img
scroll-icon youtube-img
scroll-icon youtube-img
scroll-icon youtube-img
scroll-icon youtube-img
scroll-icon youtube-img
scroll-icon youtube-img
scroll-icon youtube-img
ARE YOU A FRESHER? REGISTER NOW
Looking for your first Dream Job?
Update Resume
Upload Resume