1-BTS commissioning in either WH or at sites through ESI or Node pre-staging.
2- Fault rectification.
3-Responsible for Cleaning of site after completion of work, disposing of all the packing material as per the instruction & stacking of remaining material properly & safely & filling up surplus material list along with details of quantity & description of unused & surplus material.
4-Quality of work of vendor to be checked.
5-Connecting & Routing all the E1, Sync, Alarm, RF Jumper, Power, Earthing cables as per IE document using proper Installation material i.e. Cable chutes & conduits etc.
6-Responsible for end to end field activity as per project.
7- Ensure that no connection swap at sites.